Ukraine Home Insulation Grants 2026: Windows, Heat Pumps, Up to UAH 200,000
Getting money back for new windows or a heat pump isn’t a myth. By mid-2026, Ukrainian households had already submitted over 48,000 grant applications under the country’s energy efficiency programs. And yet most people either don’t know where to start — or start in the wrong place and forfeit their reimbursement entirely.
“Tepliy Dim” (Warm House) and “Zrobymo Razom” (Let’s Do It Together) aren’t welfare programs for low-income households. They’re open to any property owner, regardless of income. But the two programs work on entirely different logic — and confusing them is an expensive mistake.
# Tepliy Dim vs Zrobymo Razom: what’s the difference in 2026
These are two distinct programs with fundamentally different mechanics. Tepliy Dim runs through OSBBs — Ukraine’s legally registered apartment building co-ownership associations. Residents hold an assembly, vote on works, hire a contractor from the Fund’s registry, and the reimbursement lands in the OSBB’s bank account. Zrobymo Razom is for homeowners acting alone: you apply for specific work, get approval, complete the renovation, submit your documentation, and the Fund transfers your share back.
There’s a detail that rarely gets mentioned. Under Tepliy Dim, the grant rate depends on the energy efficiency class the building achieves after renovation. Per Fund data, buildings that reach class C or higher receive 70% reimbursement; class D gets only 40%. That means a rough estimate won’t cut it — you need an energy audit before you plan the works.
Under Zrobymo Razom in 2026, the rates break down like this: wall and roof insulation up to 50%, windows and doors up to 40%, heat pumps and biomass boilers up to 70%. And there’s a bonus: if your home sits in an area affected by active hostilities or is officially classified as war-damaged, you get an extra 10 percentage points on top.
# How much will you actually get: grant calculation for windows and insulation
No illusions here. The grant is a reimbursement of money you’ve already spent — not an advance. You pay first, the Fund verifies your documentation, then transfers the funds.
A worked example for a 120 m² private house:
- 8 PVC double-glazed windows (energy-saving glass units): UAH 96,000 — 40% reimbursement = UAH 38,400
- Façade insulation (100 mm mineral wool): UAH 84,000 — 50% reimbursement = UAH 42,000
- Attic floor insulation: UAH 18,000 — 50% reimbursement = UAH 9,000
- Total spend: UAH 198,000 → grant: UAH 89,400
That’s not the ceiling. Add a heat pump to the same application and your combined grant approaches UAH 200,000 — the statutory maximum. According to Energy Efficiency Fund figures, 12% of Zrobymo Razom applicants in 2025 received the maximum payout, and they all did it through comprehensive, combined renovation projects.
One thing to be clear on: the calculation base is the amount shown on your receipts and work completion certificates — not your own estimate. If a contractor inflates the figures, the Fund runs its own assessment against regional market price indices and recalculates downward. Any discrepancy above 15% from market rates triggers an automatic revision.
# Heat pump grant: eligibility, conditions, and approved equipment
The heat pump is the most financially attractive item in the program — 70% reimbursement when documentation is correct. It’s also where the most rejections happen. And the reason is almost always the same: the equipment isn’t on the registry.
The Fund maintains a live list of approved equipment at fondeif.gov.ua, under “Реєстр обладнання” (Equipment Registry). As of June 2026, it includes 214 air-to-water heat pump models and 67 ground-to-water models. Brands on the list include Bosch, Viessmann, Danfoss, Daikin, and Ukrainian-made Defro in its HP configuration. If your model isn’t on the list, there’s no grant — regardless of how good the equipment is technically.
Requirements for the heat pump grant:
- The house must already have a functioning heating distribution system (radiators or underfloor heating). A pump without pipework doesn’t qualify.
- Pump output: 5–25 kW for a private home under Zrobymo Razom.
- Installation must be carried out by a certified contractor from the Fund’s registry.
Here’s what many applicants miss: if you’re installing a heat pump alongside insulation works, that’s one application, one inspection, one grant. Combining work types in a single application isn’t just allowed — it’s smarter, because the Fund assesses the full estimate as a whole.
# How to apply via Diia: a step-by-step walkthrough
Open Diia — Ukraine’s government services app — and go to “Гранти та компенсації” (Grants & Compensation) → “Грант на енергоефективність” (Energy Efficiency Grant). You’ll need to log in via BankID or qualified electronic signature (KEP). With documents prepared in advance, the process takes 15–20 minutes.
Step 1. Fill in the application form: property address, type (private house or apartment), floor area, list of planned works.
Step 2. Attach your documents (details in the next section). The system automatically cross-checks ownership against government registries — in most cases you won’t need to upload title documents manually.
Step 3. Wait for a decision — up to 30 business days. In practice, the Fund has been faster in 2026: per their press office, the median processing time is 14 business days.
Step 4. Once approved, you have 12 months to complete the works. Hire a contractor from the Fund’s registry, sign the agreement, and proceed with renovation.
Step 5. Upload your work completion certificates, invoices, and photo evidence to Diia. Before-and-after photos are mandatory — missing them is one of the most common rejection triggers. The Fund reviews within 15 business days and transfers the grant.
One honest note: Diia’s grant section isn’t the smoothest interface. If the document upload stalls, switch to Chrome — or visit a Fund office in your city. The full list is at fondeif.gov.ua.
# Documents required to receive the grant
The list is shorter than most people expect. Diia integrates with the Ministry of Justice and State Tax Service registries, so a lot pulls through automatically.
For a private house (Zrobymo Razom):
- Passport and tax ID number (verified automatically via BankID)
- Title document for the property (ownership certificate or registry extract) — automatic in most cases
- Technical passport or certificate of floor area
- Work scope and preliminary cost estimate from a registered contractor
- Photos of the façade and interior “before renovation” — uploaded manually
After work completion, additionally:
- Work completion and handover certificate
- Payment documents (receipts, bank statements)
- “After” photos
- Equipment warranty documentation (for heat pumps, boilers, windows)
For OSBBs the list is longer: assembly minutes showing the vote result (minimum 75% of owners in favour), the contractor agreement, and a technical specification. But that’s the OSBB board’s responsibility — not every individual resident’s.
# Top mistakes that get applications rejected
Per Energy Efficiency Fund statistics for 2025, 23% of applications were rejected or sent back for revision. The most common reasons are entirely predictable.
Mistake #1: work starts before approval. This is an automatic disqualifier. The contractor agreement date must be later than the Fund’s approval date. No exceptions.
Mistake #2: contractor not in the Fund’s registry. The registry is updated regularly — check fondeif.gov.ua before signing the contract, not two days before submitting completion documents.
Mistake #3: equipment not on the approved model list. This catches heat pump and boiler applicants most often. If you bought a brand that’s not on the list, you won’t get a grant — even if the unit outperforms everything in the registry.
Mistake #4: no “before” photos. The Fund needs documented proof of the original condition. If you photographed the site after removing the old windows, your evidence is gone. Take photos on the day you submit the application.
Mistake #5: address discrepancies across documents. If the property register shows one address and your technical passport shows another — common after street renaming — the Fund will pause your application. It’s fixable through the Bureau of Technical Inventory (BTI), but costs you time.
And don’t try to inflate the estimate. The Fund uses independent assessors and benchmarks costs against regional market price indices. A quote more than 15% above market rates triggers a recalculation.
# How to choose a contractor and protect your grant
The Fund’s certified contractor registry as of June 2026 lists 1,847 companies across Ukraine. Find them at fondeif.gov.ua under “Реєстр виконавців” (Contractor Registry), with filters for region, work type, and rating.
Being on the registry is the minimum bar — not a quality guarantee. What else to check:
- Number of completed grant projects (shown in the registry) — aim for 10 or more
- Current liability insurance
- Willingness to provide a detailed cost estimate in the Fund’s required format — it’s a specific form, not a free-form document
A practical tip: get quotes from 2–3 different registered contractors. Price spreads on identical work run up to 30%. Since the grant is calculated on actual costs rather than a fixed sum, you’re better served by an honest price than an inflated one.
# OSBBs and the Tepliy Dim grant: what to decide at the assembly
For a multi-apartment building, the process is more involved — but the scale is different too. Insulating a 48-flat building can cost UAH 3–5 million; at 70% reimbursement, the grant alone covers UAH 2.1–3.5 million. Worth the assembly.
The meeting minutes must record: approval by at least 75% of owners by vote (per Article 10 of Ukraine’s Law on OSBBs, No. 2866-III), the scope of works, the cost estimate, and the name of the authorized representative who’ll liaise with the Fund.
The most common board-level mistake: signing the contractor agreement before the Fund approves the application — to “save time.” That’s an automatic rejection. The sequence is strict: assembly → application → approval → contractor agreement. No shortcuts.
One detail boards often miss: the Fund requires a dedicated bank account for receiving the grant — you can’t use the OSBB’s main operating account. Opening a new account takes 5–7 business days; build that into your timeline.
If your building doesn’t have a registered OSBB yet, Tepliy Dim isn’t accessible to you. The structure has to exist before the money can flow.
One more thing: if you’re a sole proprietor (Ukrainian: ФОП) or own a non-residential property, the Energy Efficiency Fund programs don’t apply. Different tools exist for that — UKEEP (lending through Ukrainian banks with partial interest compensation) and EU grants through the EBRD. That’s a separate topic.
The core principle is simple: the sequence matters more than anything else. Application first, then contractor. “Before” photos first, then installation. Everything else is detail.
And don’t put this off. Zrobymo Razom has annual funding — in 2025 it ran out in September. The 2026 budget was raised to UAH 4.2 billion, but that’s not unlimited. When the allocation is gone, it’s gone until the next fiscal year.
Subscribe to Kompanion — we track changes to Fund programs and report when new application windows open, limits increase, or regional top-ups become available. Missing that update means leaving real money on the table.
# See also
- Personal finance and household budgeting
- Loans for small business and sole traders
- Financial calculators: grants and subsidies
- Microloans and alternative financing in Ukraine
Frequently asked questions
Who is eligible for Ukraine's home insulation grant in 2026?
Any owner of a private home or apartment (through an OSBB — a Ukrainian co-ownership association) on government-controlled Ukrainian territory. According to the Energy Efficiency Fund, internally displaced persons (IDPs) can apply using their temporary address, as long as the property is listed in the official register. Homes in disrepair or under legal seizure are excluded.
Can I get reimbursed for windows I've already installed?
No. The Zrobymo Razom program only covers work completed after the Fund approves your application. Installing windows before you apply is the most common reason applicants lose their grant entirely. One exception: under Tepliy Dim, an OSBB may include pre-planned tendered works if the application is submitted before the contractor agreement is signed.
What's the heat pump grant in 2026?
Air-to-water and ground-to-water heat pumps qualify for up to 70% reimbursement of equipment and installation costs, subject to the UAH 200,000 overall cap. According to Energy Efficiency Fund data for Q1 2026, the average heat pump payout was UAH 87,000. The specific model must appear on the Fund's approved equipment list at fondeif.gov.ua.
Can I combine a Fund grant with Ukraine's eOselya mortgage program?
Partially. eOselya is a subsidized mortgage for purchasing a home; the energy efficiency grant is a separate payment for renovation work. You can use both — buy through eOselya first, then apply to the Fund for insulation upgrades. But eOselya loan funds can't count as "own financing" in the grant calculation, per Cabinet Resolution No. 2440.
How long does the whole process take — application to payout?
Typically 2–4 months. The Fund reviews applications within 30 business days. After approval, you have 12 months to complete the work. Payment follows within 15 business days of submitting your completion documents and photo evidence. Per the Fund's 2025 report, 78% of payouts were completed within 90 days.